Gawler Link
South Australia
Project — Gawler East Link Roadway
Client — Bardavcol
Works — Application of anti-graffiti coating.
https://www.dpti.sa.gov.au/infrastructure/completed_projects/gawler_east_link_road
In the 2015-16 Budget, the State Government announced $55 million for the construction of the Gawler East Link Road (GELR) Project. In February 2018, Bardavcol were announced as the successful Tenderer for the design and construct contract with DPTI. Construction commenced in late 2018, following substantial design works, and works are expected to be completed within 2020. The Gawler East Link Road will provide local traffic with direct access to Main North Road without travelling through the Gawler Town Centre, reducing travel times, reducing the likelihood of crashes and minimising the vehicle emissions caused by travel delays.
(taken from the website https://www.dpti.sa.gov.au/infrastructure/road_projects/gawler_east_link_road)
Portolesi Structural was contracted by Bardavcol to apply the anti-graffiti coating to the various concrete elements.
3133